PEER RFP 25-05 Now Closed
Deadline for submissions December 1 at 11:59pm (PT).
The deadline to submit questions to peer_center@berkeley.edu is November 22 at 5pm (PT).
- Download the blank proposal form (Word file, 110 KB)
- Download the Solicitation 2025-05 (pdf): "Modernization and Integration of the PEER Column Performance Database"
- SUBMIT PROPOSAL HERE
PEER-Bridge RFP 25-04 Now Closed
Deadline extended to October 31 at 11:59pm (PT).
The deadline to submit questions to peer_center@berkeley.edu(link sends e-mail) is October 7 at 5pm (PT).
- Download the blank proposal form (Word file, 110 KB)
- Download the Solicitation PEER-BRIDGE 25-04 (pdf): "Seismic Performance Assessment and Optimization of Accelerated Bridge Construction (ABC) Column Connections"
- SUBMIT PROPOSAL HERE
- Q & A:
PEER-Bridge RFP 25-03 Now Closed
The deadline to submit technical proposals is October 8 at 11:59pm (PT).
The deadline to submit questions to peer_center@berkeley.edu(link sends e-mail) is October 1 at 5pm (PT).
- Download the blank proposal form (Word file, 110 KB)
- Download the Solicitation PEER-BRIDGE 25-03 (pdf): "Improvement of Capacity Models in the Caltrans Risk-Based Seismic Design (CT-RBSD) Procedure"
- SUBMIT PROPOSAL HERE
- Q & A:
Answer: It is for a PEER-Bridge project, which has the full overhead by UC-Caltrans agreement. Please use 35% for overhead.
Answer: As noted in the "Background" section of the RFP, a significant amount of work was done in the past that is related to the current work. The current proposal will build on the past work done on this topic. Building from previous projects, prior expertise and experimental capabilities are required to execute this project.
PEER-Bridge 25-01 and 25-02 Now Closed
The deadline to submit technical proposals is June 30 at 11:59pm (PT).
The deadline to submit questions to peer_center@berkeley.edu is June 20 at 5pm (PT).
- Download the blank proposal form (Word file, 110 KB)
- Download the Solicitation PEER-BRIDGE 25-01 (pdf): "Fatigue Evaluation and Design of Filled and Partially Filled Metal Grid Deck System"
- Download the Solicitation PEER-BRIDGE 25-02 (pdf): "Stiffness Properties of Reinforced Concrete Bridge Column under Superimposed Deformations due to Secondary Load Effects"
- SUBMIT PROPOSAL HERE
- Q & A: